HS2: Rolling Stock and Depot Engineering, Design, and Integration Challenges
Technical lecture
13 May 2026 17:30 - 21:00
This event has finished
Description

|
An overview will be given of Britain’s new high-speed railway – High Speed Two – connecting London and Birmingham, some of the key civil engineering aspects, and the challenges with the construction of the line. They will also discuss the specification, design and construction of the high-speed rolling stock and Washwood Heath Depot in Birmingham, highlighting some of the engineering and technical integration challenges that come with a major infrastructure project.
If you’re unable to attend in person the event will be available online: Online Lecture
Note: The presentation may be requested from the chairperson after the event. The video of the presentation will be available on the IMechE YouTube channel:https://www.youtube.com/@imecheuk


Supported by Anglia Ruskin University and Select Engineering Ltd
|
Improving the World Through Engineering
Speaker(s)
Bernie Rowell is a Project Client Director for Rolling stock and Washwood Heath Depot and Damian Wheeler is the Head of Washwood Heath Depot, HS2 ltd.
Address
Anglia Ruskin University
MAB 221, Michael Ashcroft Building
Bishop Hall Land
Chelmsford, Essex
CM1 1SQ
United Kingdom