Pipeline commissioning using the nitrogen slug shortening methodology
Technical lecture
20 May 2021 17:00 - 18:00
This event has finished
Description
In summer 2020, the Trans Adriatic Pipeline (TAP) was successfully commissioned and opened the Southern Gas Corridor to bring Azeri gas to Europe.

This presentation will cover the relative novel approach of commissioning the TAP pipeline sections using the nitrogen slug shortening methodology. This involves using a pressurised nitrogen slug to de-air the pipeline without using inline pigs.

The methodology involves the management of air/nitrogen and nitrogen/natural gas interfaces, and the mixing of these gases at the interface, as the medium moves along the pipeline at varying velocities and pressures.


Speaker(s)
Eur Ing Andrew Allday CEng MIMechE,
William Hewison CEng MIChemE MBA
Address
Online
Virtual event
Switzerland