Crossrail - Moving Towards Operations

      Add to your calendar Last updated - 26/10/2015 15:24

Talk
19 November 2015 17:30 - 20:15
This event has finished
Description

There has been a huge amount of positive news from Crossrail over the past few years, culminating in the completion of tunnelling in the summer of 2015. This has been a major achievement. So what’s left to do? In short, an awful lot! The project is described as only 65% complete (and this excludes the rolling stock!).

Before joining Crossrail, our speaker, John Doyle, was General Manager on the Victoria and subsequently the Jubilee Lines of London Underground. He lived through nearly 7 years of operating the Victoria Line whilst it was being upgraded and, on the Jubilee line managed the task of exploiting a modern flexible moving block signalling system.

John will outline the numerous engineering, people and process activities that will have to be successfully completed if Crossrail is to start operations in 2018. The journey has started!

Date: 19th November 2015

Time: 17.30 for a 18.00 start. The lecture/discussion will be concluded by 19.45 followed by networking

Venue: Network Rail, The Quadrant, Elder Gate Milton Keynes MK9 1EN, United Kingdom

Speaker(s)

John Doyle - Deputy Operations Director, Crossrail

Address

The Quadrant:MK
Elder Gate
Milton Keynes
MK9 1EN
United Kingdom

Contact Details

Tom Scaramuzza

Furzton Floor 3
The Quadrant:MK
Elder Gate
MK9 1EN
Milton Keynes, United Kingdom
Email: Send a message

Cart Shopping basket (0)


© 2011 Institution of Mechanical Engineers. IMechE is a registered charity in England and Wales number 206882

‚Äč