Description
Trams are not new to Croydon. Until 1951 trams ran through the town along the A23, before being closed to make room for more buses and cars. By the mid-1980s, central Croydon had seen huge increases in motorised traffic, and London Regional Transport (one of TfL's predecessor organisations) carried out a study to consider whether the reintroduction of trams could help to reduce traffic volumes, and also provide better links to the poorly connected New Addington area. The Tram system opened in 2000, and as well as on street running, it made use of a number of disused railway alignments.
London Trams took over the running of the Trams in 2008 and completely refurbished the Tramlink network. The system uses a combination of on-street and segregated running. A project to increase capacity between Wimbledon and Croydon was completed in 2016. London Trams is also looking at track upgrades and improvements to security and policing on the system. The tram network currently has 28km of track, 35 trams in the fleet and 39 stops. It serves seven National Rail stations and more than 50 bus routes.
Tram Operations Limited (TOL), a subsidiary of First Group, operates the trams day-to-day. London Trams have their own in-house maintenance team working 24/7 making sure that all trams are out in operations.
This technical visit will provide attendees with an opportunity to tour Croydon Trams’ Therapia Lane Depot and learn more about its operations and maintenance activities, with opportunities for discussion and questions throughout the visit.
Please note orange hi-vis and safety boots are required for this visit.