NESS EfW facility visit   Fully Booked

      Add to your calendar Last updated - 10/10/2025 20:54

Technical visit
30 October 2025 14:30 - 16:00
This event has finished
Description

Modern plants are not like the incinerators of old. They burn non-recyclable waste cleanly and completely while conforming to strict standards for emissions, producing heat and electricity.

The NESS EfW Waste facility, recently constructed in Aberdeen, is capable of processing 150,000 tonnes of municipal solid waste every year, generating electricity which is sent to the national grid.

We will be taken on a guided tour of the facility and be presented with an overview of the project.
To register for this event please click on 'Book Now' at the top of the page.

If you have any queries please contact us using the details at the bottom of the page.

Due to the limited places please let us know if you have booked and are no longer able to attend, or have any queries (see contact details below).

Transport and Parking

If arriving by car, please park on the street to the side of the building, on Greenwell Road.

If using public transport, the nearest bus stop is on Wellington Road, approximately a 10-minute walk from the facility. The bus routes that operate to Wellington Road are the number 3, 3A, 59 which can all be accessed on Bridge Street or the X8, which can be accessed on Guild Street.

 Arrival and Meeting Point.

Upon arrival at the site, please use the grey pedestrian gate which leads into the staff and contractor carpark.  This gate has a call point and you will be required to call to gain access to the site.  Please follow the onscreen prompts.  You should select either Gatehouse or Reception. 

From there, proceed to the revolving gate where you will be met and taken to the site reception to sign in. 

PPE & Group info

When touring the facility PPE must be worn.  This will be provided to you so no need to take any with you. Please be aware that footwear must be sensible, bearing mind you will be walking and ascending and descending stairs. There are no sling backs, open toed or high heels permitted on site. We also ask for long sleeve tops to be worn.

Address

NESS Energy Project
NESS Energy Project
Greenbank Crescent
Aberdeen
AB12 3BG
United Kingdom

Contact Details

Alexey Yasinskiy CEng, MIMechE

Aberdeen, United Kingdom
Email: Send a message

Alternative contact Nick Graves CEng, MIMechE

Email: Send a message

Cart Shopping basket (0)


© 2023 Institution of Mechanical Engineers. IMechE is a registered charity in England and Wales number 206882