Re-signalling the Underground – 4LM Signalling
Technical lecture
18 October 2023 18:00 - 19:00
This event has finished
Description
The projected demand for increases in trains per hour and the
need to replace assets reaching the end of life is driving the Four Lines
Modernisation Programme. Despite highly complex flat junctions, interfaces to
other signalling systems and the need to accommodate unfitted rolling stock,
the re-signalling of London Underground’s District, Hammersmith and City,
Metropolitan and Circle Lines has been an almost unprecedented challenge. Hear
how this challenge is being met from Transport for London’s Project
Director, Chris Hobden and Head of Engineering Capital Projects, Sam
Etchell.
Light refreshments will be served from 17:30 with the talk starting at 18:00.
Attendees are encouraged to attend in-person to take advantage of networking and engagement with our speaker. An online option will be provided using Teams. Meeting joining instructions will be emailed closer to the event.
Speaker(s)
The speaker for this lecture is Chris Hobden, Project Director and Sam Etchell, Head of Engineering Capital Projects at Transport for London.
Address
RSSB
Floor 4
The Helicon
1 South Place
London
EC2M 2RB
United Kingdom